2012年2月16日木曜日

PARATEX  【 Coating film waterproof 】

Will be updated very Yellowtail.


You have construction method of the B-2, B-4 construction, B-1 construction of PALTEX waterproof. All are in the pit construction.


Use harness at all times because of the cold, and then Jet heater, temperature control was important.


So for Pitt in the work involves risk of hypoxia and blower also gave perfect ventilation.


B-1 method is (1) primer coating (2) B material coating



Is the B-2 construction method (1) primer coating (2) B material coating (3) application of paraquat

  

Is B-4 construction method (1) primer coating 2 B material coating (3) EM coating (4) GSS coating 1 (5) GSS applications second



Progress proceeds well and completed

2012年2月6日月曜日

パラテックス防水B-2

①パラテックスプライマー塗布 ②パラテックスB材鏝塗り ③パラコート鏝塗り の工程です。画像はパラコート鏝塗り直後の画像です。